Home

Urban Transformation Solutions & Construction Contracting Model

The construction-contracting alternative to flat-for-land: renew your at-risk building at a transparent cost without giving up units.

Urban Transformation Solutions & Construction Contracting Model — Savaş Grup

Urban Transformation

For buildings classified as at-risk under Türkiye's Law No. 6306, Savaş Grup A.Ş. offers a construction-contracting model instead of flat-for-land: owners keep their full land share while the building is demolished and rebuilt for a fixed, quantity-based fee. Risk assessment, design, permits and construction are handled by one team; the process averages 12–18 months.

In urban renewal, the biggest loss for property owners is having to hand part of their units to a developer. For at-risk buildings under Law No. 6306, Savaş Grup A.Ş. offers the construction-contracting model instead of flat-for-land: owners keep their entire land share, and the building is demolished and rebuilt at a fixed price based on quantities. Risk assessment, support applications, design, permits and construction are handled in one hand; the process takes 12–18 months on average.

Flat-for-Land or Construction Contracting?

CriterionFlat-for-landConstruction contracting (Savaş Grup model)
Land share30–50% goes to the developerStays fully with the owners
CostHidden in the units given awayQuantity-based, fixed in the contract
FinancingDeveloperPublic grant/loan + owner contribution
Quality decisionsDeveloperOwners, with independent building inspection
SuitsPlots with very high land valueMost buildings where flat-for-land does not work economically

Contract, payment and inspection details are explained step by step in the construction-contracting alternative to flat-for-land.

Scope: One Contract from Assessment to Occupancy

  • Risk assessment with a licensed institution; interpretation of the performance analysis report
  • Owners' assembly briefing, decision minutes and contract structure (simple-majority rule)
  • Preparation of "Half on Us" (Istanbul), rent-support and loan applications
  • Architectural, structural, mechanical and electrical design; soil survey; municipal permit
  • Evacuation plan, demolition and excavation
  • New building to TBDY 2018: C30+ concrete, ductile detailing, thermal and waterproofing, lift and parking
  • Sample-flat approval, finishes, common areas
  • Occupancy permit, title update, turnkey handover and technical support

2026 Support and the Picture by City

In Istanbul, buildings with a risk assessment completed by 31 December 2026 qualify for the "Half on Us" grant + loan + relocation package; see your building's total instantly with the "Half on Us" support calculator. In Ankara, İzmir and other provinces the Ministry's general rent-support and loan programmes apply. Priority districts, support amounts and process differences by city are in our guides: Istanbul urban renewal 2026, Ankara urban renewal and strengthening, İzmir urban renewal 2026.

Step by Step

  1. Free initial consultation — building, title and zoning status; briefing at the owners' meeting.
  2. Risk assessment (3–6 weeks) — report, provincial approval, title-deed annotation.
  3. Decision and contract — simple-majority decision; quantity-based contracting agreement, progress-payment plan.
  4. Support applications — "Half on Us" / rent support / loan.
  5. Design and permit (2–4 months) — sample flat and material list approved by the owners.
  6. Demolition and construction (10–14 months) — independent building inspection and regular owner updates.
  7. Occupancy and handover — occupancy permit, title deeds, keys.

Can the Building Be Strengthened Instead?

If the performance analysis concludes "can be strengthened", demolition is not the only option. Our decision table by building age, concrete strength, zoning rights and budget is in strengthen or rebuild; our building renovation and strengthening team works under the same contract structure. Note that "Half on Us" funds demolition and rebuild only.

Why Savaş Grup?

  • You give away no units: your land share and every flat stay yours; the cost is fixed in the contract.
  • One contact: assessment, applications, design, permits, construction and occupancy in one team.
  • Transparency: itemised quantities, progress-based payments, regular site reports and owners' meetings.
  • 27+ years, ISO 9001: housing and estate experience on both sides of Istanbul; certified quality control.

Where We Work

Headquartered in Istanbul, we work with owners' assemblies on both sides of the city — Avcılar, Bahçelievler, Bağcılar, Kadıköy, Maltepe and Kartal above all — and in Ankara and İzmir. Share your building's risk report or address; we will brief the owners' meeting free of charge and prepare a quantity-based proposal.

In numbers

27+

Years of Experience

350+

Completed Projects

22

Countries Served

ISO 9001

Quality Management System

Urban Transformation

How the Urban Transformation process works

  1. 01

    Site Survey & Needs Analysis

    We inspect the site, then define your goals, budget and timeline together.

  2. 02

    Design & 3D Visualisation

    Architectural, structural and MEP designs are prepared and presented with photorealistic renders.

  3. 03

    Proposal & Contract

    A transparent bill-of-quantities proposal, a clear schedule and a payment plan are signed off.

  4. 04

    Construction & Site Management

    Works are executed under ISO 9001 quality protocols with weekly reporting and HSE audits.

  5. 05

    Handover & Support

    Turnkey handover after testing and commissioning; ongoing technical support after delivery.

Urban Transformation

Urban Transformation FAQs

01Kentsel dönüşüm sürecinde hangi adımlar takip ediliyor?
Süreç, binanızın "Riskli Yapı" tespitinin yapılmasıyla başlar. Ardından Savaş Grup uzmanlarıyla mimari tasarım ve bütçelendirme aşamasına geçilir. Ruhsat ve yasal izinler alındıktan sonra eski bina güvenle yıkılır. Şeffaf hakediş raporlarıyla ilerleyen yeni inşaat süreci tamamlandığında, iskanı (yapı kullanma izni) alınmış şekilde mülkünüz size eksiksiz teslim edilir.
02Kat karşılığı yerine neden "Taahhüt Modelini" seçmeliyim?
Geleneksel kat karşılığı modelinde arsanızın büyük bir kısmını müteahhit firmaya devredersiniz ve mülkünüz küçülür. Savaş Grup Taahhüt Modeli'nde ise arsa payınızı devretmez, %100 mülk sahibi olarak kalırsınız. Sadece inşaat yapım maliyetini karşılayarak, biten dairelerinizi güncel piyasa değerinden satıp çok daha yüksek bir net kâr elde edersiniz.
03Devlet desteklerinden (kira yardımı, kredi) faydalanabilir miyim?
Evet, riskli yapınızı yenilerken Çevre, Şehircilik ve İklim Değişikliği Bakanlığı'nın sunduğu kentsel dönüşüm kira yardımlarından veya düşük faizli finansman (kredi) desteklerinden yasal olarak faydalanabilirsiniz. Savaş Grup, bu başvuru ve evrak süreçlerinin sorunsuz yürütülmesi için size kapsamlı danışmanlık sağlar.
04Yeni binanın iç ve dış mimarisine, malzemelerine kim karar veriyor?
Taahhüt modelimizin en büyük ayrıcalığı budur. Geleneksel müteahhitlikteki standartların aksine; dış cephe konseptinden kullanılacak yalıtım malzemelerine, mutfak dolaplarından akıllı ev (IoT) sistemlerine kadar tüm detayları tamamen sizin bütçeniz, onayınız ve zevkiniz doğrultusunda projelendiriyoruz.
05Kentsel dönüşüm inşaatı ortalama ne kadar sürede tamamlanır?
Belediye ruhsat ve resmi onay süreçleri tamamlanıp temel atıldıktan sonra, standart ölçekli bir konut projesi ortalama 8 ila 12 ay içerisinde anahtar teslim aşamasına getirilir. Projenin metrekare büyüklüğüne ve lüks donanım detaylarına göre kesin teslim tarihi yapım sözleşmesinde şeffaf bir şekilde güvence altına alınır.
06Teslimat sonrası teknik destek sunuyor musunuz?
Anahtar teslim aşamasında binanızın tüm tesisat, izolasyon ve mekanik sistemlerinin testleri yapılarak eksiksiz teslim edilir. Taşıyıcı sistem için yasal mevzuatın öngördüğü sorumluluklar geçerlidir; iç işçilik, çatı ve yalıtım kalemlerinde teknik destek hizmetimiz teslim sonrasında da devam eder.
07What is the difference between flat-for-land and construction contracting?
In flat-for-land, the contractor is paid with a share of the new units. In construction contracting, owners pay a fixed fee calculated from quantities and keep 100% of the units and land share.
08How long does an urban-transformation project take?
From the risk report to occupancy permit, a typical 8–24 unit building takes 12–18 months, of which 8–12 months is construction.
09Can the project be financed?
Yes. Owners can use state-supported urban-transformation loans and rent assistance under Law No. 6306; we prepare the required documentation.
Urban Transformation

Articles on Urban Transformation

Urban Transformation

Get a quote for this service

Fill in the form for a free survey and a transparent, quantity-based proposal; we reply within 24 hours.