Home

Turnkey Hotel Construction

City hotels, boutique hotels, resorts and convention centres — investor-focused turnkey delivery including spa, pool and MEP.

Turnkey Hotel Construction — Savaş Grup

Hotel Construction

Savaş Grup A.Ş. manages the construction of five-star hotels, boutique hotels, resorts and convention centres from 2,000 to 50,000 m², from architectural design to turnkey handover. Fire safety, acoustics, spa-pool and kitchen infrastructure are coordinated by one team; projects are delivered to ISO 9001 standards.

Hotel construction is not ordinary building work: revenue per room, operating cost and guest experience are decided at the drawing board. Savaş Grup A.Ş. delivers city hotels, boutique hotels, resorts, holiday villages and convention centres of 2,000–50,000 m² from feasibility to operations-ready handover under one contract, with fire safety, acoustics, kitchen, laundry and spa-pool infrastructure coordinated by the same team.

Hotel Projects We Work On

  • City hotels (60–200 rooms) — for business and convention demand, with a commercial ground floor.
  • Boutique hotels — new builds in keeping with a historic fabric, or conversion of an existing building.
  • Resorts and holiday villages — spread-out layouts on the Aegean and Mediterranean coasts with landscaping, pools and beach infrastructure.
  • Convention and event centres — long-span halls, acoustics and stage infrastructure.
  • Thermal and wellness hotels — thermal water lines, hammam, spa and treatment units.

Scope: From Feasibility to Operations-Ready Handover

  • Site appraisal, room-count and area optimisation, compliance with operator brand standards
  • Architectural concept, 3D visualisation, construction drawings; tourism operating licence and building permits
  • Structure: reinforced-concrete or steel frame to TBDY 2018, foundations based on the soil survey
  • Fire safety: escape routes, sprinklers, smoke extraction, fire compartments
  • Acoustics: room-to-room and façade sound insulation, mechanical noise control
  • Commercial kitchen, laundry, cold rooms, waste and back-of-house logistics
  • Pool, hammam, sauna and spa — with our spa, pool and wellness construction team
  • Room and public-area finishes, furniture and decoration — with our interior architecture and decoration team
  • Testing, commissioning, operations training and operations-ready handover

Five Issues That Decide a Hotel Project

IssueWhy it mattersOur approach
Room moduleRoom width and bathroom layout set the grid of the whole building1:1 mock-up room built to the operator's standard
Fire and escapePrerequisite for the tourism licence and insuranceSprinkler and compartment design integrated early
AcousticsDirectly affects guest satisfaction and ratingsDouble-leaf walls, floating floors, vibration isolation of plant
EnergyThe largest operating-cost itemHeat pumps, heat recovery, solar, room automation
PhasingMissing a season delays the return on investmentSchedule that runs structure and finishes floor by floor in parallel

Process and Timeline

  1. Feasibility and concept (3–6 weeks) — room count, area programme, operator requirements.
  2. Construction drawings and permits (3–5 months).
  3. Structure (6–10 months) — depending on storeys and ground.
  4. MEP and finishes (6–9 months) — floor by floor after mock-up approval.
  5. Testing, commissioning and pre-opening (1–2 months).

A typical 100-room city hotel is operations-ready in 18–24 months; resorts take 24–30 months because of their spread-out layout. We describe the stages in professional steps in turnkey hotel construction.

Where Is Hotel Investment Heading in 2026?

Business and convention hotels in Istanbul, resort renewals on the Aegean–Mediterranean coast and 60–120-room city hotels along the reviving Hatay–Kahramanmaraş corridor stand out; we assess regional demand and formats in hotel and tourism investment in the earthquake zone.

Why Savaş Grup?

  • One contract: architecture, structure, MEP, spa-pool, interiors and furniture in one team; we speak the operator's technical language.
  • Transparent quantity-based proposals and progress-based payments; change requests priced item by item.
  • 27+ years, 22 countries: hospitality projects across Türkiye, the Balkans, North Africa and the Gulf; familiarity with international brand standards.
  • ISO 9001 quality management and records aligned with independent building inspection.

Where We Work

Headquartered in Istanbul, we run hotel projects across Türkiye and abroad, working with the landowner or operator under a turnkey contract or a project partnership model. Share the plot details, target room count and operating model and we will prepare a free pre-feasibility and a quantity-based proposal.

Hotel Construction

Hotel Construction: areas of application

01

Luxury Hotels and Resorts

High-standard luxury hotel complexes, spa centers, and resorts. We build prestigious tourism facilities with modern architectural designs, energy-efficient systems, and comfort-focused interiors.

02

Boutique Hotels

Boutique hotels and guesthouses with personalized concepts. We create unique accommodations using designs suited to local architecture, eco-friendly materials, and specialized acoustic solutions.

03

Conference and Event Centers

Conference halls, exhibition areas, and multi-purpose facilities for large-scale meetings and events. We provide business-focused tourism solutions with smart technology integrations and flexible space layouts.

04

Resorts and Recreation Facilities

Family-friendly resorts, aquaparks, and sports facilities. We construct safe and durable structures, environmentally conscious designs, and high-capacity infrastructures for tourism-oriented recreation areas.

In numbers

27+

Years of Experience

350+

Completed Projects

22

Countries Served

ISO 9001

Quality Management System

Hotel Construction

How the Hotel Construction process works

  1. 01

    Site Survey & Needs Analysis

    We inspect the site, then define your goals, budget and timeline together.

  2. 02

    Design & 3D Visualisation

    Architectural, structural and MEP designs are prepared and presented with photorealistic renders.

  3. 03

    Proposal & Contract

    A transparent bill-of-quantities proposal, a clear schedule and a payment plan are signed off.

  4. 04

    Construction & Site Management

    Works are executed under ISO 9001 quality protocols with weekly reporting and HSE audits.

  5. 05

    Handover & Support

    Turnkey handover after testing and commissioning; ongoing technical support after delivery.

Hotel Construction

Hotel Construction FAQs

01What steps are followed in the hotel construction process?
First, site analysis and feasibility studies are conducted. Architectural and structural plans are then prepared, and necessary permits and licenses are obtained. The construction process begins with foundation excavation, followed by the installation of load-bearing systems, floor and façade construction, mechanical and electrical systems, and interior arrangements. Finally, all tests are completed, and the hotel is delivered turnkey to the investor.
02How are hotel construction costs calculated?
Cost calculation considers the hotel's concept (boutique, 4-star, 5-star, resort), number of rooms, architectural features, material quality, and amenities. Costs generally range from 10,000 to 25,000 TL per m². Simple city hotels are more economical, while resort projects with SPA, pools, ballrooms, and luxury amenities are higher. Final pricing is determined after project and specification review.
03What types of hotel projects do you have experience with?
We have extensive experience in city hotels, boutique hotels, holiday villages, resort hotels, convention centers, and business hotels. We provide aesthetic, functional, and sustainable solutions for various accommodation segments.
04How is eco-friendly hotel construction implemented?
We implement energy-efficient lighting and HVAC systems, integrate solar panels, recycle greywater, and use rainwater collection systems. We also use recycled and eco-friendly materials, ensuring projects meet LEED and other green building certifications.
05How are project delivery timelines determined?
For small boutique hotels (20–50 rooms), 8–12 months; for medium-sized hotels (100–200 rooms), 12–18 months; for large-scale resorts and convention hotels (200+ rooms), 18–24 months. Additional amenities (SPA, aquapark, ballroom, etc.) may require extra time. Final schedules are determined after site surveys and project details are reviewed.
06What commissioning and post-handover support services are provided for hotels?
Before delivery, all mechanical, electrical, and automation systems are tested, and fire and safety inspections are performed. Staff training and trial operations are conducted. Ongoing technical support and maintenance are provided after delivery. Post-delivery, 6 months of free technical support and maintenance planning are offered.
Hotel Construction

Articles on Hotel Construction

Hotel ConstructionFebruary 23, 2026· 7 min read

Turnkey Hotel Construction & Architectural Projects

Bring your tourism investments to life with Savaş Group. 27 years of experience, professional hotel architecture, and turnkey construction solutions meeting global standards.

Hotel Construction

Get a quote for this service

Fill in the form for a free survey and a transparent, quantity-based proposal; we reply within 24 hours.