Ankara Urban Renewal 2026: Demolish or Strengthen?
The at-risk building stock in Altındağ, Mamak, Keçiören and Çankaya, 2026 rent-support amounts and the criteria that decide between strengthening and rebuilding.
No demolition, no lost floor area: performance analysis, CFRP and jacketing retrofits plus façade, MEP and interior renewal.

Renovation & Strengthening
Savaş Grup A.Ş. performs seismic performance analysis of existing buildings and brings them into compliance with the Turkish Seismic Code (TBDY-2018) without demolition, using CFRP wrapping, column/shear-wall jacketing and foundation strengthening. Façade, MEP, thermal insulation and interior renewal are completed in the same project; a typical apartment retrofit takes 3–6 months without evacuating residents.
Not every at-risk building has to be demolished. Where the performance analysis concludes "can be strengthened", building strengthening brings the existing structure up to the Turkish Seismic Code (TBDY 2018) without demolition — and usually without residents moving out. Savaş Grup A.Ş. delivers analysis, strengthening design, permits and execution under one contract, with façade, services, thermal insulation and interior renewal completed in the same project. A typical apartment block takes 3–6 months.
The right decision rests on the seismic performance analysis of a licensed institution. If the report says "demolition required", rebuilding is the only route; if it says "can be strengthened", these criteria apply:
| Criterion | Favours strengthening | Favours rebuilding |
|---|---|---|
| Age and drawings | Under 25, drawings available | Over 35, no drawings |
| Concrete strength | C16 or better, limited corrosion | Below C14, widespread corrosion |
| Zoning | Existing storeys match zoning rights | New plan allows more floor area |
| Budget | Well below the rebuild cost | Strengthening exceeds half the rebuild cost |
| Living | Work possible without vacating | Services and energy efficiency also need renewal |
We walk through the decision table with examples in strengthen or rebuild in Ankara. If the decision is to rebuild, our urban renewal solutions team takes over under the same contract structure.
For a typical 8–10-storey block the total is 6–9 months; rebuilding the same building takes 18–24 months.
From our Istanbul base we work across Türkiye — above all with owners' assemblies in Istanbul, Ankara (Çankaya, Keçiören, the Etimesgut cooperative estates) and İzmir. Share your building's performance report, or let us commission it together; we will prepare a free comparative budget for both options and your proposal.
In numbers
27+
Years of Experience
350+
Completed Projects
22
Countries Served
ISO 9001
Quality Management System
We inspect the site, then define your goals, budget and timeline together.
Architectural, structural and MEP designs are prepared and presented with photorealistic renders.
A transparent bill-of-quantities proposal, a clear schedule and a payment plan are signed off.
Works are executed under ISO 9001 quality protocols with weekly reporting and HSE audits.
Turnkey handover after testing and commissioning; ongoing technical support after delivery.
The at-risk building stock in Altındağ, Mamak, Keçiören and Çankaya, 2026 rent-support amounts and the criteria that decide between strengthening and rebuilding.
Renovation & Strengthening
Fill in the form for a free survey and a transparent, quantity-based proposal; we reply within 24 hours.